Operating rules for steam heat exchangers


Release time:

2022-09-15

   The operating rules of steam heat exchangers generally consist of several parts, specifically: inspection and preparation before use,Steam heat exchangerPrecautions when using, putting into use, stopping and cleaning. Check and prepare before using the steam heat exchanger Check that the static grounding of the hot steam heat exchanger is good. Check whether the anchor bolts and connecting flange bolts are loose. Check whether the inlet and outlet valve are in good condition, whether the hand wheel is complete and easy to use. Check the surface of the steam heat exchanger shell for defects such as deformation, scratches, cracks, rust pits, etc. Check whether the temperature, pressure gauge and other instruments are in good use. It can be used only after passing the pressure test.

蒸汽换热器的操作规则

   Preventive measures are strictly prohibited in the use of overtemperature, overpressure, so as not to affect the service life, damage to the equipment. The heat exchanger is strictly prohibited from heating on one side to avoid leakage. Once leakage occurs, it should be removed in time. It is strictly prohibited to rise and fall the temperature too fast. Semi-closed vent valve is strictly prohibited to avoid oil movement or fire. If the heat exchanger leaks, remove the hot steam heat exchanger. Frequently check the pressure, temperature changes andSteam heat exchangerWhether there is a leak. Frequently check whether there is leakage at the flange connection of the big head cover, pipe box, vent valve, etc.

   Put into use the drain steam heat exchanger memory water, steam through, preheating, steam through the heat exchanger. Valve body caving and purging, pay attention to the shell and tube process at the same time. After the temperature is stable, fully open the cold and hot liquid valve. Before putting into use, check whether the vent valve is closed tightly to avoid oil running or fire. When using a hot steam heat exchanger, the cooling oil should be drawn out first, and then the heating oil should be drawn out to avoid leakage due to rapid deformation of the equipment.

   Slowly start the oil diversion, slightly open the cold oil exhaust valve, fully open the cold oil exhaust valve, and then slowly open the cold oil inlet. When there is oil in the vent valve, immediately close the vent valve and wait for the heat exchanger to be filled with oil. The oil should be heated slowly to prevent a small amount of stored water from being suddenly heated and vaporized, causing a surge in pressure and damaging the equipment. First, slightly open the hot oil exhaust valve, fully open the hot oil exhaust valve, and then slowly open the hot oil inlet. If there is oil in the vent valve, immediately close the vent valve and wait for the hot steam heat exchanger to be filled with oil. Pay attention to system pressure changes and whether there is leakage during operation. If there is a problem, please switch to the second line. After the equipment is put into use, detailed inspection shall be carried out, no abnormal situation shall be left, and records shall be made.

   Stop using Open the auxiliary valve of the hot oil pipeline first, and then close the inlet and outlet valves of the hot oil. Open the auxiliary valve of the cold oil pipeline first, and then close the cold oil inlet and outlet valves. In case of normal shutdown, steam cleaning shall be carried out with the process pipeline. If removed for maintenance, steam cleaning of steam heat exchanger shall be carried out. When the oil is above 200 ℃, it should be properly cooled and then cleaned.

   After the cleaning process on the cleaning shell side is changed, the steam can be cleaned to prevent overpressure from damaging the equipment. When steam purging, consideration should be givenSteam heat exchangerCan withstand one-way heating capacity, purge one-way, reverse direction of the exhaust valve open. After blowing, stop steam and drain water for repair.